Permanent Prediction Record
×
Window Elapsed
No Match Found
The forecast window has closed. No qualifying seismic event was recorded within the predicted parameters.
Predicted Magnitude
M3.1
7.6 miles West of Niland
Original Prediction Parameters
Predicted Location
7.6 miles West of Niland
33.2453°N, 115.6496°W
Forecast Time Window
25th of August 2026
Aug 25, 2026 21:33:25 PST
Predicted Magnitude
M3.1
Predicted value
Focal Depth
15.0 km
Below surface
Prediction Type
Prospective
Live forward-issued before the event
Lead Time
46h 34m
Advance notice before predicted event time
Location Map
Predicted epicentre
Matched Earthquake
⚠ Preliminary - subject to revision when the pipeline confirms the result
A recorded earthquake fell within every matching tolerance, so this prediction is graded a true positive. Each parameter below shows how close the match was.
Distance Error
40.5 km
Within 125 km tolerance
Time Error
1.3 h
Within 48 h tolerance
Magnitude Error
0.12
Predicted M3.12 vs actual M3.0
Depth Error
20.0 km
Pred. 15.0 km vs actual 5.0 km
Matched Event Location
-
Integrity & Provenance
Integrity Fingerprint (SHA-256)
60601e62b3cf47e4c625d184e9cc620abf44539bcc5c431fa64a5ec1acc02a7a
Computed at ingestion from the original prediction values (ID, latitude, longitude, magnitude, event time, depth, run tag) and stored immutably. Any field changed after ingestion is recorded in the amendment log below.
Prediction ID
loc-33.25--115.65-t10345
Evaluation Protocol
v1
Model Version
v1
Prediction Type
Prospective
Publication Batch (UTC)
Aug 23, 2026 22:58:38 PST
Source Batch
20260824_171736_prediction_JSON_file.json
First Recorded (UTC)
2026-08-23 22:58:38.748308+00:00
Amendment History
event_time
2026-08-25 21:33:25.823000+00:00
2026-08-25T21:33:25.823
"pipeline re-ingest"
run_tag
2026-08-23 22:58:38.180424+00:00
2026-08-24T03:20:10.608424+00:00
"pipeline re-ingest"
run_tag
2026-08-23 22:58:38.180424+00:00
2026-08-25T02:05:55.328776+00:00
"pipeline re-ingest"
event_time
2026-08-25 21:33:25.823000+00:00
2026-08-25T21:33:25.823
"pipeline re-ingest"